EV fleet charging for UK depots. Up to £2,500 a month.
That £2,500 is an upper figure from surplus charging, not an average. ZOLB EV sizes overnight AC and rapid DC to the duty cycle so vehicles leave charged. The Depot Charging Scheme is not open for applications. The next window is expected on 28 October 2026.
- 50kW dual rapid DC from £15,959 ex VAT
- 80–240kW stations £26,000–£36,000 ex VAT
- Installation quoted after survey · see pricing
What could a depot earn from surplus bays?
An illustrative range. The £2,500 figure on this page is an upper bound, not a typical result. For a forecast built on vehicle count, dwell and tariff, book a free depot survey, compare diesel and electric in the fleet cost calculator, or use the full ROI calculator.
Get my depot surveyIllustrative only. Actual revenue depends on site, utilisation and tariff. Overnight AC and rapid DC are specified after survey.
Applications are closed. The next window is expected on 28 October.
Find a Grant says the scheme is not currently open. It part-funds charge point and civil costs at depots for battery-electric vans, HGVs and coaches. It does not pay for the vehicles, and it is not a Workplace Charging Scheme voucher. Eligibility, templates and both windows are set out in the Depot Charging Scheme guide.
Not open today
Window 2 — expected 28 Oct 2026 to 29 Jan 2027
Window 1 — closed 30 June 2026
Who can apply
What to have ready
Hardware, software and support — sized to the duty cycle.
Overnight AC for vehicles that sit. Rapid DC for vehicles that turn. One platform to schedule, bill and keep utilisation visible across the depot.
01
Hardware
AC overnight (7–22kW) and rapid DC (50–240kW) specified to how long vehicles actually stand. Dual-port stations charge two vehicles at once.
- 50kW dual rapid from £15,959 ex VAT
- 80–240kW stations £26,000–£36,000 ex VAT
- Load management so the supply is not over-specified
02
Software
Schedule charging to off-peak tariffs, track energy per vehicle and export billing. Platform from £25/month per charger, or £50/month with maintenance.
- Smart charging schedules
- Real-time depot analytics
- Driver, visitor or private-fleet billing
03
Uptime support
Remote monitoring around the clock. Most faults are cleared before a vehicle misses a slot. Driver support is handled by us.
- 24/7 driver and operator support
- Remote diagnostics first
- Maintenance available on the £50/month package
Vehicles leave charged. The site does not stall.
Duty-cycle design
We specify overnight AC or rapid DC from how long vehicles actually stand — not a catalogue default.
Smart load management
Chargers share available site power automatically, so you do not buy a supply upgrade before you need one.
Off-peak scheduling
Push charging into cheaper hours. Energy cost falls; vehicles are still ready for the first route.
Shared depot bays
Other operators can use surplus capacity. If the bays are grant-funded, Find a Grant requires cost-recovery pricing for at least three years, and commercial vehicles must be the primary users.
Depot Charging Scheme
Applications are closed. We line up survey, power and civils so a van, HGV or coach depot is ready if the next window opens on 28 October. Staff car parks use a different grant.
Scales with the fleet
Start with a few bays and add more. Same platform, same app, no rip-and-replace.
50kW dual rapid from £15,959 ex VAT.
Hardware prices match the pricing page. Installation depends on power and civils, so it is quoted after the depot survey rather than shown as a single “from” figure.
50kW rapid
from £15,959
dual rapid DC hardware, ex VAT
- Two vehicles per station
- Typical rapid session 30–60 minutes
- Common depot and destination choice
80–240kW
£26,000–£36,000
per station, ex VAT
- Higher-power depot and turnaround sites
- Specified after the power study
- Overnight AC quoted where dwell allows
Software
from £25/mo
per charger, or £50 with maintenance
- Schedules, billing and energy reports
- Live status across every bay
- Installation via pricing and survey
Indicative hardware pricing, ex VAT. Installation, civils and grid upgrades are quoted after survey. T&Cs apply. Software from £25/month per charger.
Sites that cannot afford a dead bay.
“Really pleased with our rapid 150kW charger setup. Not only enhancing convenience for our fans but also generating impressive additional revenue.”
Alex Harris Commercial Manager, Peterborough United FC
“We’re thrilled with the EV charging installation from ZOLB EV at Voco, St. David’s, Cardiff. Their professional service and reliable solution provide great convenience for our guests.”
Konstantin Grimm General Manager, Voco Hotel
“The new chargers are fast, driver-friendly, and offer seamless payment options via app or credit/debit card. We’re thrilled with the results.”
Matt Wesson CTO, Barons Eden (Hoar Cross Hall)
Ready if the 28 October window opens.
-
1
Free depot survey
We map vehicle count, dwell, power and whether the Depot Charging Scheme is the right route — then specify AC, DC or both.
-
2
Application-ready pack
Charge point and civil scope written against the official templates, without assuming a window 2 grant rate. Window 1’s 70% and £1 million cap applied only to that closed round.
-
3
Install around operations
Civils and commissioning planned around the roster. Schedules go live and surplus bays can take paying drivers.
Applications are closed. Get the depot ready anyway.
Book a free depot survey so power, civils and the vehicle plan are in place if the next window opens on 28 October. Confirm the live status on Find a Grant before you apply.